• RU
  • icon Waiting For Moderation: 1
Menu

MTI — design of water drainage and water supply for MUP "Kostromagorvodokanal"

Description

The project included a comprehensive analysis, calculation and design of internal cold and hot water supply systems, as well as sanitation for a two-story administrative building. The aim of the work was to develop a modern, reliable, energy-efficient and economically sound engineering solution that complies with current standards (SP, GOST, SanPiN).

 

Contents of the final qualification work

 

Topic: "Water supply and sanitation of the MUP "Kostromagorvodokanal" Kostroma, 1 Maya St., Bldg. 2A"

 

Introduction

 

Chapter 1. General characteristics of the facility1.1. Characteristics of the designed facility1.2. Space-planning solution1.3. Description of the water supply system, general plan with networks, engineering equipment

 

Chapter 2. Organizational and technological calculation2.1. Calculation of water consumption, sources of water consumption2.2. Technological scheme of the water supply system2.3. Hydraulic calculation2.4. Cold water supply system2.5. Internal hot water supply2.6. Internal sewerage2.7. Calendar schedule for the installation of water supply systems

 

Chapter 3. Section on ecology and safety of project solutions3.1. Safety precautions during work3.2. Fire safety3.3. Environmental protection measures

 

Chapter 4. Economic section4.1. General information4.2. Estimates4.3. Calculation of technical and economic indicators

 

Conclusion

 

List of references

 

Appendices (Graphic part)

Project's Content

icon hvs-gvs-sp.cdw
icon ХВС-ГВС-СП (1).pdf
icon ВКР2 (закончено) (1).pdf
icon ВКР2 (закончено) (2).docx
The material is an archive with files that can be opened in programs:
  • Kompas or KOMPAS-3D Viewer
  • Adobe Acrobat Reader
  • Microsoft Word
up Up