MTI — design of water drainage and water supply for MUP "Kostromagorvodokanal"
- Added: 27.08.2025
- Size: 5 MB
- Downloads: 0
Description
The project included a comprehensive analysis, calculation and design of internal cold and hot water supply systems, as well as sanitation for a two-story administrative building. The aim of the work was to develop a modern, reliable, energy-efficient and economically sound engineering solution that complies with current standards (SP, GOST, SanPiN).
Contents of the final qualification work
Topic: "Water supply and sanitation of the MUP "Kostromagorvodokanal" Kostroma, 1 Maya St., Bldg. 2A"
Introduction
Chapter 1. General characteristics of the facility1.1. Characteristics of the designed facility1.2. Space-planning solution1.3. Description of the water supply system, general plan with networks, engineering equipment
Chapter 2. Organizational and technological calculation2.1. Calculation of water consumption, sources of water consumption2.2. Technological scheme of the water supply system2.3. Hydraulic calculation2.4. Cold water supply system2.5. Internal hot water supply2.6. Internal sewerage2.7. Calendar schedule for the installation of water supply systems
Chapter 3. Section on ecology and safety of project solutions3.1. Safety precautions during work3.2. Fire safety3.3. Environmental protection measures
Chapter 4. Economic section4.1. General information4.2. Estimates4.3. Calculation of technical and economic indicators
Conclusion
List of references
Appendices (Graphic part)
Project's Content
|
|
|
|
|
|
|
|
- Kompas or KOMPAS-3D Viewer
- Adobe Acrobat Reader
- Microsoft Word