• RU
  • icon Waiting For Moderation: 0
Menu

Maintenance of the heating system of the 3rd building with lower bottling

  • Added: 15.04.2021
  • Size: 2 MB
  • Downloads: 0

Description

The project envisages reconstruction of the existing heating system of the residential building

Project's Content

icon Отопление 06,05,2019.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView

Additional information

Drawings content

icon Отопление 06,05,2019.dwg

Отопление 06,05,2019.dwg
up Up