Job Instruction for Laying of Underground Gas Distribution Network Section
- Added: 28.06.2016
- Size: 6 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The following are reflected in the Job Instruction: diagram of pipes installation, diagram of soil development in the trench (plan, section), longitudinal profile of the trench, technical characteristics of the machines (DZ-18 bulldozer, EO-3322 excavator, MAZ 503 aircraft axle), safety instructions, work schedule
Project's Content
tehkarta.dwg
|
Similar materials
- 29.07.2014
- 24.04.2014
- 24.04.2014
- 24.04.2014
Free downloading for today
Update after: 19 hours 38 minutes