• RU
  • icon Waiting For Moderation: 22
Menu

Job Instruction for Installation of Trusses and Coating Plates

  • Added: 06.01.2015
  • Size: 665 KB
  • Downloads: 3
Find out how to download this material

Description

The process map is broken down for the installation of trusses with a run of 24m. mass 1.87 t, that 18 m. mass 1.28t, column of the extreme that middle row with mass 10.4t, column of fahweru with mass 6.6t.

Project's Content

icon korolyuk.dwg

Free downloading for today

Update after: 12 hours 10 minutes
up Up