Installing the Portioner
- Added: 17.08.2014
- Size: 56 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Portioner installation drawing is executed in autocade program. The figure shows: membrane valve, valve body, cheek, cover, patch, wire, bolts.
Project's Content
|
9_16.dwg
|
Additional information
Drawings content
9_16.dwg
Similar materials
- 24.01.2023
- 25.01.2023
Free downloading for today
Update after: 12 hours 39 minutes