• RU
  • icon Waiting For Moderation: 1
Menu

Design of the metal-frame building of the medical and health center

Description

This diploma project was carried out as a study of engineering and technical solutions for the production planned for construction in Omsk. The construction of the Production is scheduled for 2023-2024. 

The construction object - the main production building of the Catalyst Production - is located on the territory in Omsk

Project's Content

icon 1.dwg
icon ВКР№2.docx
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
  • Microsoft Word
up Up