course design of bridge crane Q = 15t
- Added: 20.01.2020
- Size: 790 KB
- Downloads: 2
Description
The bridge crane consists of two main parts - a bridge and a freight trolley. The crane bridge is a metal structure resting on running wheels, which are driven by the bridge movement mechanism. The freight trolley consists of a frame and mechanisms for moving the trolley and lifting the cargo. All three mechanisms (bridge movement, trolley movement and cargo lifting) are installed on the bridge, have independent engines.
Project's Content
|
|
2лист.cdw
|
3лист.cdw
|
kran.cdw
|
Расчётно-пояснительная записка.doc
|
Additional information
Contents
Contents
2лист.cdw
3лист.cdw
kran.cdw
Similar materials
- 25.10.2022
- 25.01.2023