• RU
  • icon Waiting For Moderation: 0
Menu

Construction of foundations for intermediate support of road bridge

  • Added: 23.10.2014
  • Size: 743 KB
  • Downloads: 0
Find out how to download this material

Description

One drawing in the compass.
On the drawing - a geological section and an epyura of conditional resistance, location of can of piles in a grillage, the plan of the bridge footing, a ditch fragment, immersion of a pile, a timbering construction, construction of the base, a grillage, construction of a support, reinforcing of a grillage, seal of piles in a grillage.

Project's Content

icon chertezh.cdw-5.
up Up