• RU
  • icon Waiting For Moderation: 0
Menu

Calculate reliability indicators using statistical methods based on the initial information on the pre-repair resources (PR) of 50 cylinder liners of the YaMZ-236 engine

Description

Calculate reliability indicators using statistical methods based on the initial information on the pre-repair resources (PR) of 50 cylinder liners of the YaMZ-236 engine

Project's Content

icon Кривая распределения ресурсов _ Курсовая работа по НТС.cdw
icon 1.docx
icon Вероятностная бумага ЗРВ _ Курсовая работа по НТС.cdw
The material is an archive with files that can be opened in programs:
  • Kompas or KOMPAS-3D Viewer
  • Microsoft Word
up Up