Cable output to the support U110-4 + 5. Installation of end couplings
- Added: 15.03.2022
- Size: 9 MB
- Downloads: 1
Subscribe to receive an information about new materials:
Description
Output of three-core cable 35 kV to the support U110-4 + 5. Installation of 35 kV end couplings on the U110-4+5 support
Project's Content
|
|
The material is a file that can be opened in program:
- AutoCAD or DWG TrueView
Additional information
Drawings content
Выход кабеля на опору У110-4+5. Установка концевых муфт .dwg
Similar materials
- 24.04.2014
- 25.01.2023
- 24.04.2014
Free downloading for today
Update after: 12 hours 29 minutes
Other materials
- 20.08.2014