BVR passport for a single-track railway tunnel (f=9, f=2.4)
- Added: 25.12.2023
- Size: 1 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Computational graphic work on the excavation of soil by drilling and blasting method (soil strength 2.4 bench method, soil strength 9 excavation of soil for full cross-section)
Project's Content
BVR_PZ_ITOG.docx
|
бвр итог.dwg
|
Similar materials
- 03.06.2023
- 29.04.2023
Free downloading for today
Update after: 16 hours 42 minutes