A separate boiler house with a capacity of 7.87 Gcal for heating the hotel. Part 2.

- Added: 24.07.2015
- Size: 6 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The second part includes AR drawings, CTP drawings and heat supply to them, CTP foundations, some local estimates)
Project's Content
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Similar materials
- 24.01.2023
Free downloading for today
Update after: 4 hours 58 minutes