A separate boiler house with a capacity of 7.87 Gcal for heating the hotel. Part 2.
Description
The second part includes AR drawings, CTP drawings and heat supply to them, CTP foundations, some local estimates)
Project's Content
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Similar materials
- 24.01.2023
Free downloading for today
Update after: 13 hours 52 minutes