• RU
  • icon Waiting For Moderation: 1
Menu

90 mm DN Pipeline PE Transport Under Railway

Description

The project of crossing the polyethylene pipeline in a protective casing under the railway tracks. 

The drawing was made as part of the course work on the basis of the standard design of STO Gazprom

Project's Content

icon Переход жд дороги.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView
up Up