Get Your Download Link
Material: Boguchanskaya hydroelectric power station on the river. Hangar - Strengthening cementation of the base of the second pillars of sections 2, 3 of the concrete dam (work from the drainage tunnel)
- The download link should have been sent to the email you provided during purchase. However, sometimes emails may not be delivered. Here you can request a download link
- You can request your download link within 30 minutes after purchase
- Enter the email you provided at checkout and you will immediately receive the download link automatically
- Each purchase can only be redeemed once
- If you purchased the material but still couldn't get it, write to Contacts