• RU
  • icon Waiting For Moderation: 16
Menu

TTK Performance of works on closed (trenchless) pipeline laying in steel protective casings (cases) under railways by push-through method - typical Job Instruction

  • Added: 24.04.2014
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 562.rtf
up Up