Reconstruction of the 0.4 kV electric network of the village of Luki, Korelich district with the development of automatic reserve entry "Minsk 2018
- Added: 17.06.2019
- Size: 2 MB
- Downloads: 5
Subscribe to receive an information about new materials:
Description
In this diploma project, the reconstruction of the 0.4 Kv electric network of the village of Luki, Korelich district is being carried out with the development of automatic reserve entry. The graphic part contains: general plan of power grids 0.4 kV, diagram of TP 10-0.4 kV, Basic diagram of ALT, Diagram of electric grids 10-0.4 kV, Diagram of the WFD, Diagram of SFD, layout of TP equipment, TEO.
Project's Content
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- Microsoft Word
- Visio
Similar materials
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 28.03.2025
Free downloading for today
Update after: 4 hours 53 minutes