• RU
  • icon Waiting For Moderation: 27
Menu

Reconstruction of the 0.4 kV electric network of the village of Luki, Korelich district with the development of automatic reserve entry "Minsk 2018

  • Added: 17.06.2019
  • Size: 2 MB
  • Downloads: 5
Find out how to download this material

Description

In this diploma project, the reconstruction of the 0.4 Kv electric network of the village of Luki, Korelich district is being carried out with the development of automatic reserve entry. The graphic part contains: general plan of power grids 0.4 kV, diagram of TP 10-0.4 kV, Basic diagram of ALT, Diagram of electric grids 10-0.4 kV, Diagram of the WFD, Diagram of SFD, layout of TP equipment, TEO.

Project's Content

icon
icon Содержание (6-7 листы).doc
icon 3 СХЕМА ПРИНЦИПИАЛЬНАЯ АВР.vsd
icon 8 ТЭО.vsd
icon 7 Оборудование.vsd
icon 6 СХЕМА УСТАНОВКИ ЩУЭ.vsd
icon 5 СХЕМА УЗ ВЛИ.vsd
icon 4 СХЕМА ТП new.vsd
icon 2 СХЕМА ЭЛЕКТРОСЕТЕЙ 10 и 0.4 new.vsd
icon 1 Генплан.vsd
icon Ведомость (2лист).doc
icon Реферат.doc
icon ПЗ.doc
icon Задание (листы 3-4).docx

Free downloading for today

Update after: 13 hours 26 minutes
up Up