Reconstruction of the 0.4 kV electric network of the village of Luki, Korelich district with the development of automatic reserve entry "Minsk 2018
- Added: 17.06.2019
- Size: 2 MB
- Downloads: 5
Find out how to download this material
Subscribe to receive an information about new materials:
Description
In this diploma project, the reconstruction of the 0.4 Kv electric network of the village of Luki, Korelich district is being carried out with the development of automatic reserve entry. The graphic part contains: general plan of power grids 0.4 kV, diagram of TP 10-0.4 kV, Basic diagram of ALT, Diagram of electric grids 10-0.4 kV, Diagram of the WFD, Diagram of SFD, layout of TP equipment, TEO.
Project's Content
|
Содержание (6-7 листы).doc
|
3 СХЕМА ПРИНЦИПИАЛЬНАЯ АВР.vsd
|
8 ТЭО.vsd
|
7 Оборудование.vsd
|
6 СХЕМА УСТАНОВКИ ЩУЭ.vsd
|
5 СХЕМА УЗ ВЛИ.vsd
|
4 СХЕМА ТП new.vsd
|
2 СХЕМА ЭЛЕКТРОСЕТЕЙ 10 и 0.4 new.vsd
|
1 Генплан.vsd
|
Ведомость (2лист).doc
|
Реферат.doc
|
ПЗ.doc
|
Задание (листы 3-4).docx
|
Similar materials
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
- 24.01.2023
Free downloading for today
Update after: 10 hours 2 minutes
Other materials
- 25.01.2023