Radio Relay Line Project for OAO TNK-Uvat Oil Field

- Added: 09.07.2014
- Size: 16 MB
- Downloads: 1
Subscribe to receive an information about new materials:
Description
Design of radio relay line on equipment FibeAir 1500P, total length of radio path 264 km, Ethernet + SDH. The following issues are considered: Equipment selection, RRL configuration, communication organization, calculation of RRL parameters, profile construction, equipment configuration and placement, power supply, calculation of EMF and its components, estimated operating costs of RL and RL
Project's Content
![]() |
![]() ![]() ![]() |
Similar materials
- 24.01.2023
- 25.10.2022
Free downloading for today
Update after: 5 hours 35 minutes