• RU
  • icon Waiting For Moderation: 27
Menu

Cafe on the road. Full Project

  • Added: 14.08.2014
  • Size: 16 MB
  • Downloads: 3
Find out how to download this material

Description



The composition includes:
Washing dishes -
Personnel room
Cafe at 48pos.mest-
Method of service with -barman through bar rack. Operation mode is semi-variable.

Project's Content

icon
icon
icon
icon
icon последний Чертеж2.dwg
icon
icon листы вк1.dwg
icon спецификация вк.doc
icon
icon ТЕХНОЛОГИЯ.15.04.10.ОКdwg.dwg
icon ТЕХНОЛОГИЯ.15.04.10.ОКdwgпод архитектуру.bak
icon ТЕХНОЛОГИЯ.15.04.10.ОКdwgпод архитектуру.dwg
icon
icon разбивочный.dwg
icon съёмка.jpg
icon
icon plot.log
icon Безимени-3.jpg
icon генплан разбивочный №2.bak
icon генплан разбивочный №2.dwg
icon
icon для ов.dwg
icon
icon водоподогреватель.pdf
icon Котёл руководство.pdf
icon Насос ГВС.pdf
icon Подпиточный насос.pdf
icon Пояснительная .doc
icon translation
icon Сетевой насос.pdf
icon Спецификация .doc
icon ТМ.dwg

Additional information

Thermal mechanical part

The boiler house design was developed on the basis of the design task, the equipment layout plan and the general heating scheme of the furnace, agreed with the Customer.

The technical solutions adopted by the construction project comply with the requirements of environmental, sanitary, fire and other applicable norms and rules and ensure safe operation of the facility for life and health of people, subject to the measures stipulated by the construction project.

Construction solutions, power supply and automation have been developed in the relevant parts of the project.

The built-in boiler room is located in a one-story cafe building on the M10grF highway (SelishcheGomelKobrin), km76/right/

The design provides for the installation of one solid fuel boiler VIADRUS U 22 D in the boiler house, with a heating capacity of 49 kW.

Design parameters of coolant in heating system 90700С.

Horizontal sections of pipelines shall be laid with a slope of at least 0.002 in the direction of medium movement.

For the needs of hot water supply in the boiler room, a capacitive water heater Viessmann VitocellV100 is installed, with a volume of 160l.

To make up the heating system, it is provided to install a polyethylene tank with a supply of chemically purified water, with a volume of 200 liters.

After installation, perform anticorrosive coating of pipelines and equipment

Perform hydraulic test of pipelines with boiler pressure 1.25 working.

Adjust safety valves for opening at overpressure, refer to boiler certificate data.

The equipment specified in the project is taken as an analogue.

Drawings content

icon последний Чертеж2.dwg

последний Чертеж2.dwg

icon листы вк1.dwg

листы вк1.dwg

icon ТЕХНОЛОГИЯ.15.04.10.ОКdwg.dwg

ТЕХНОЛОГИЯ.15.04.10.ОКdwg.dwg

icon ТЕХНОЛОГИЯ.15.04.10.ОКdwgпод архитектуру.dwg

ТЕХНОЛОГИЯ.15.04.10.ОКdwgпод архитектуру.dwg

icon разбивочный.dwg

разбивочный.dwg

icon генплан разбивочный №2.dwg

генплан разбивочный №2.dwg

icon для ов.dwg

для ов.dwg

icon водоподогреватель.pdf

icon Котёл руководство.pdf

icon Насос ГВС.pdf

icon Подпиточный насос.pdf

icon Сетевой насос.pdf

icon ТМ.dwg

ТМ.dwg

Free downloading for today

Update after: 13 hours 20 minutes
up Up