• RU
  • icon Waiting For Moderation: 41
Menu

Design of "CW and CW" System of Office Building During Reconstruction

  • Added: 14.08.2014
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description



The source of heat supply of the complex is urban heating networks. Coolant parameters - 130/70 ° С.
The total heat load of the entire complex is Qsum = 2.

Project's Content

Name Size
icon file_748.zip
2 MB
icon file_748
icon HVAC_P_Stage
icon Mp_1058_1_(har.ob.).dwg
125 KB
icon Mp_1058_2_(vent_structure).dwg
141 KB
icon Mp_1058_3_(pod._OD).dwg
152 KB
icon Mp_1058_4_(thermal_structure).dwg
303 KB
icon Mp_1058_5_(principle).dwg
554 KB
icon Mp_1058_6_(principle_cold).dwg
333 KB
icon Mp_1058_7_(ITR_equipment).dwg
201 KB
icon Mp_1058_8_(equipment..dwg
274 KB
icon Mp_1058_VOLUME_6,_SECTION_6.1,_PART_1.doc
93 KB
icon Mp_1058_VOLUME_6,_SECTION_6.1,_PART_2_AIR_EXCHANGE.doc
493 KB
icon Mp_1058_VOLUME_6,_SECTION_6.1,_PART_2.doc
967 KB

Additional information

Contents

CONTENTS

GENERAL PART

1. OV and KV SYSTEMS

2. REGULATORY DOCUMENTS

3. INPUT DATA

4. KEY PROJECT INDICATORS

5. EXTERNAL FENCES

6. INDIVIDUAL HEAT STATION

7. HEATING SYSTEMS

8. HEATING SUPPLY OF VENTILATION, AIR CONDITIONING AND AIR-HEAT CURTAINS

9. TABLE OF HEAT SUPPLY SYSTEM LOADS

10. COLD SUPPLY SYSTEMS

11. COLD SUPPLY LOAD TABLE

12. HEAT RECOVERY SYSTEMS WITH INTERMEDIATE HEAT CARRIER

13. GENERAL VENTILATION SYSTEMS

14. AIR CONDITIONING SYSTEMS

15. CALCULATION OF PARKING VENTILATION

16. SMOKE VENTILATION SYSTEMS

17. FIRE-PREVENTION ACTIONS FOR the SYSTEMS "OV and KV"

19. CONSTRUCTIVE SOLUTIONS of the SYSTEMS "OV and KV"

20. NOISE AND VIBRATION PROTECTION MEASURES

21. ENERGY-SAVING ACTIVITIES

22. AUTOMATION OF CV and CV SYSTEMS

23. EQUIPMENT AND MATERIALS

24. TABLE OF AIR EXCHANGES

up Up