• RU
  • icon Waiting For Moderation: 17
Menu

WDP for installation of fire water reserve tank V = 200 m ³

  • Added: 09.07.2014
  • Size: 11 MB
  • Downloads: 1
Find out how to download this material

Description

PWP for RVS installation with volume of 2000m3

Project's Content

icon
icon
icon sav29.tmp
icon sav30.tmp
icon sav3D.tmp
icon sav3F.tmp
icon sav44.tmp
icon sav4A.tmp
icon sav4C.tmp
icon sav4E.tmp
icon sav50.tmp
icon sav58.tmp
icon sav60.tmp
icon sav62.tmp
icon sav64.tmp
icon sav66.tmp
icon Подъем рулона корпуса.bak
icon Подъем рулона корпуса.dwg
icon Пояснительная записка.docx
icon Разворачивание рулона корпуса.bak
icon Разворачивание рулона корпуса.dwg
icon Резервуар 1.bak
icon translation
icon Резервуар.bak
icon Резервуар.dwg
icon Сборка днища резервуара.bak
icon Сборка днища резервуара.dwg

Additional information

Summary

The work design provides for the installation of technological equipment of a tank with a capacity of 2000 m ³ weighing up to 58 tons by the method of unfolding a roll blank using:

• Motor crane KS5473 with lifting capacity Q = 25t .

• KATO NK-750 VSL vehicle crane with lifting capacity Q = 75t .

• Tractors C- 100

Developed: installation plan, installation diagrams of roll blanks unfolding and installation accessories.

Economic efficiency and safety requirements are given.

Scope of installation works 58 t, including tank 49 t.

Scope of the project in A4 sheets -

Drawings content

icon Подъем рулона корпуса.dwg

Подъем рулона корпуса.dwg

icon Разворачивание рулона корпуса.dwg

icon translation

translation

icon Резервуар.dwg

Резервуар.dwg

icon Сборка днища резервуара.dwg

Сборка днища резервуара.dwg
up Up