• RU
  • icon Waiting For Moderation: 2
Menu

TTK Installation of single-line reinforced concrete support using falling boom (instead of dismantled wooden intermediate support) - typical Job Instruction

  • Added: 24.04.2014
  • Size: 133 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 599.rtf
up Up