• RU
  • icon Waiting For Moderation: 5
Menu

Rearranged bunker

  • Added: 06.07.2020
  • Size: 91 KB
  • Downloads: 1
Find out how to download this material

Description

Drawing of technical requirements for design of rearranged hopper loaded by bucket forklift truck. 1. The hopper is designed to transfer the load from the bucket loader to the conveyor of the mobile LPC. 2. Geometrical capacity 3.4 m.kub. 3. Hopper loading - by bucket, unloading - by gravity through hole 0, 4x0.7 m. 4 Bunker welded, metal, rearranged .

Project's Content

icon voronka_bunker.dwg

Additional information

Drawings content

icon voronka_bunker.dwg

voronka_bunker.dwg
up Up