• RU
  • icon Waiting For Moderation: 34
Menu

Performance of works at height during installation of internal pipelines and equipment of ventilation and refrigeration systems

  • Added: 08.01.2019
  • Size: 921 KB
  • Downloads: 0
Find out how to download this material

Description

Performance of works at height during installation of internal pipelines and equipment of ventilation and refrigeration systems

Project's Content

icon grafika_k_ppr.dwg

Additional information

Drawings content

icon grafika_k_ppr.dwg

grafika_k_ppr.dwg
up Up