• RU
  • icon Waiting For Moderation: 27
Menu

Organization of construction of a 16-storey residential building in Tomsk

  • Added: 27.10.2022
  • Size: 950 KB
  • Downloads: 0
Find out how to download this material

Description

Course project on the discipline "Organization, planning and management in construction"

1. The topic of the course project "Organization of the construction of a 16-storey residential building in Tomsk"

2. Initial data to the course project of Tomsk; 16 floors; Floor height – 3m; Variant of execution of external walls – 4; The height of the basement floor is 3m; Soil – clay (-1.6); Wall thickness – 200mm; ceiling thickness – 180mm; Basement wall thickness – 300mm; Cross-section of basement columns – 500x500mm; Cross-section of monolithic beams – 500x250mm; Thickness of FP – 600mm; Class of concrete used – В22.5; Diameter/pitch of reinforcement – 16/200mm; The temperature of concrete after laying - +10; the pace of construction of a standard floor is 11 days.

3. Content of the text part (list of tasks to be solved)

introduction;

description of the initial data;

determination of the normative duration of the construction of the object;

development of a schedule for the production of works on the object:

determination of the composition (nomenclature) of volumes, labor intensity and machine intensity of work;

selection of rational ways to perform the main construction and installation works;

determination of the duration of work,

preparation of a work identification card;

development of a network model;

calculation of the network schedule;

optimization of the network schedule for the duration of construction;

development of a schedule for the production of works on the object according to the optimized network schedule;

drawing up schedules for the movement of workers on the object, the movement of the main construction machines on the object and the receipt of building structures, products, materials and equipment at the facility;

optimization of the schedule for workforce;

development of a construction master plan for the main period:

calculation of the household town;

calculation of warehouse facilities;

design of temporary roads;

calculation of the need for construction in electrical energy;

calculation of the need for construction in water;

technical and economic indicators for the project;

bibliography.

4.List of graphic material (with indication of mandatory materials) 

network schedule of construction of the facility;

a schedule of works on the object with technical and economic indicators for the project;

schedule of movement of working personnel on the object;

schedule of movement of the main construction machines on the object;

schedule of receipt of building structures, products, materials and equipment at the facility;

construction master plan for the period of above-ground works (with explication
inventory (mobile) buildings and structures (with symbols).

Project's Content

icon ОПУС.dwg
icon ПЗ Опус.docx

Additional information

Drawings content

icon ОПУС.dwg

ОПУС.dwg

icon ПЗ Опус.docx

up Up