• RU
  • icon Waiting For Moderation: 4
Menu

GRES Construction Plan 1200 MW

  • Added: 05.05.2014
  • Size: 49 KB
  • Downloads: 0
Find out how to download this material

Description

Design of organization and production for installation of equipment of the boiler turbine workshop of the GRES. One drawing.

Project's Content

icon
icon
icon StroIgenplan GRYeS 1200MVt.cdw

Additional information

Drawings content

icon StroIgenplan GRYeS 1200MVt.cdw

StroIgenplan GRYeS 1200MVt.cdw
up Up