• RU
  • icon Waiting For Moderation: 9
Menu

Diploma "Heat Supply"

  • Added: 17.08.2012
  • Size: 702 KB
  • Downloads: 3
Find out how to download this material

Description

drawings, inventory

Project's Content

icon
icon лист3_peso1.dwg
icon лист4_peso3.dwg
icon лист5_reconstruc1.dwg
icon лист6_reconstruc2.dwg
icon лист7_sxema.dwg
icon лист8_avtomatica.dwg
icon лист9_ОПУС-Схема.dwg
icon лист9_ОПУС-Схема2.dwg
icon лист10_ОПУС-планграфик.dwg
icon Реферат.doc
icon СОДЕРЖАНИЕ.doc
icon лист1_общие данные.dwg
icon лист2_set.dwg

Additional information

Contents

Introduction

1 Transfer of heat supply system from boiler houses № 3.22, 28 and quarterly

boiler house p. Victory for centralized heat supply from TEC

1.1 Definition and clarification of heat loads

1.2 Heat Consumption Schedules

1.3 Network water temperature control schedules

1.4 Determination of estimated coolant flow rates

1.5 Hydraulic calculation of heat network pipelines

1.6 Development of hydraulic modes

1.7 Calculation of throttling devices

1.8 Calculation and selection of equipment for the reconstructed area

2 CTP design (special section)

2.1 Thermal and hydraulic calculation of plate water heaters

2.2 Selection of pumps

3 Automation of thermal and hydraulic mode of CTP

3.1 Automation Objectives and Objectives

3.2 Operation principles of local automation circuits

3.3 Automation Instruments and Tools

4 Organization of construction production

4.1 Determination of excavation volumes

4.2 Selection of equipment for construction and installation works

4.3 Main Solutions for Works Performance

4.4 Calculation of main technical and economic indicators

4.5 Quality control of works performance

5 Economics

5.1 Fundamentals of Pricing of Construction Products in Market Conditions

5.2 Local estimate for the reconstruction of the quarterly heating line

5.3 Calculation of annual operating costs

5.4 Main directions for saving energy resources in the heat supply system

6 Occupational and environmental protection

6.1 Safety precautions

6.2 Production sanitation

6.3 Fire Safety

6.4 Monitoring of protective grounding

6.5 Calculation of load-gripping devices strength

List of sources used

Appendix A - Design Heat Flows and Coolant Flow Rates

Appendix B - Network water temperature control schedules

Appendix B - Hydraulic Heating System Calculation

Appendix D - Calculation of labor costs for heating system

Drawings content

icon лист3_peso1.dwg

лист3_peso1.dwg

icon лист4_peso3.dwg

лист4_peso3.dwg

icon лист5_reconstruc1.dwg

лист5_reconstruc1.dwg

icon лист6_reconstruc2.dwg

лист6_reconstruc2.dwg

icon лист7_sxema.dwg

лист7_sxema.dwg

icon лист8_avtomatica.dwg

лист8_avtomatica.dwg

icon лист9_ОПУС-Схема.dwg

лист9_ОПУС-Схема.dwg

icon лист9_ОПУС-Схема2.dwg

лист9_ОПУС-Схема2.dwg

icon лист10_ОПУС-планграфик.dwg

лист10_ОПУС-планграфик.dwg

icon лист1_общие данные.dwg

лист1_общие данные.dwg

icon лист2_set.dwg

лист2_set.dwg
up Up