Course project on the basics of construction production with an explanatory note. Construction schedule of a high-rise building with a retail facility
- Added: 01.02.2024
- Size: 4 MB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
A complete course project on architecture, including the flow of assembly cranes, calculation of labor costs, down to the number of mounting bolts. All related drawings are present
Project's Content
Пояснительная записка.doc
|
KP_OSP1.dwg
|
Similar materials
- 29.05.2015
- 03.07.2014
- 24.03.2021
Free downloading for today
Update after: 4 hours 15 minutes