• RU
  • icon Waiting For Moderation: 4
Menu

9-storey 36-apartment residential building - Architecture of civil and industrial buildings - coursework

  • Added: 01.07.2014
  • Size: 699 KB
  • Downloads: 1
Find out how to download this material

Description

Course project. File contains drawings 2xA1, explanatory note

Project's Content

icon
icon Лист2.cdw
icon Лист2.dwg
icon Пояснилка.doc
icon Лист1.dwg

Additional information

Contents

1. Introduction

2. Source Data

3. General plan

4. building TEP

5. Volumetric planning solution

6. Constructive solution

a. Base

b. Walls

c. Overlappings

d. Floors

e. Roof

f. Stairwell

g. Windows and doors

7. Specification of prefabricated railway products

8. Specification of wood products

9. Finishing

10. Engineering support

11. List of used literature

Introduction

Construction is a leading branch of the Russian economy, where vital tasks of structural restructuring of the material base of the entire production potential of the country and the development of the non-production sector are solved. The efficiency of the construction complex largely depends on both the pace of development of the domestic economy and its competitiveness in the international market.

In terms of output and manpower, the construction industry accounts for about a tenth of the country's economy.

New construction is not only the growth of the taxable base, but also additional jobs and much more.

The functioning and all transformations of the construction complex on the territory of the Russian Federation objectively took place and took place in real time intervals. The following five qualitatively different states can be distinguished:

1 condition - pre-adjustment (until 1990);

2 state - transitional, hybridid-resistant (19901994);

3 condition - uncivilised-market (1995-1999);

4 state - the formation of a civilized market (since 2000).

The incredibly difficult changes in the construction complex were complicated by the general crisis state of the domestic economy, the decline in investment activities, high inflation rates, the crisis of non-payment, etc. The reduction of more than 3 times the demand for products, inflation, eating working capital, vicious depreciation policy and much more predetermined the state of the production apparatus of the industry, the level of employment and the direction of actions of economic entities in this area .

The restructuring processes in the country's economy and the nationalization of large state and installation trusts have led to a sharp increase in the number of small construction and installation organizations of various forms of ownership. At the same time as the formation of small construction organizations, the number of employees in these organizations decreased. The long-term lack of highly qualified personnel has led to their current shortage.

The current state - the fourth position - is characterized, on the one hand, by the completion of the transition to non-state forms of ownership in the construction complex, and on the other, by the beginning of the formation of an orderly system of interaction between state authorities and business entities engaged in construction activities, through urban planning and land regulation.

Source data.

The projected 9-storey building is located in a residential microdistrict of the city of Novorossiysk, according to the SNiP, the city belongs to the 4V climatic district. The designed house is intended for housing, that is, for the permanent stay and residence of people in it, so the house must meet all the requirements of a person to increase comfortable conditions. The designed large-panel 9-storey residential building is equipped with an elevator, water supply with cold drinking water and hot, central heating, sewage, waste water and other necessary equipment.

The maximum freezing depth in the city of Rostov-on-Don is 90cm.

Soils in the base - loam

Groundwater level (UHF) - 2.0 m.

Outside air temperature:

Average annual 8.7 OS

The coldest five-day week of 22 wasps

The average daily air temperature period is 110 days

General Plan.

The plot in a complex plan with dimensions of 240x240 m. On the general plan there are: two panel 5-story residential buildings, a parking lot, a sports complex, a cultural institution (library, recreation center), a recreation area and a walking area.

The building is oriented on the sides of the world, taking into account insolation, the prevailing winds that blow into the corner of the building.

Driveways on the territory of the microdistrict 6 m wide, city main street 6 m wide, sidewalks 1.5 m wide.

To protect against dust and noise, tree planting is provided. On the territory of the microdistrict there are also tree planting, shrubs, lawns.

Sanitary and fire breaks between buildings are 2050 m.

The terrain is calm in the horizons from 21.00 to 22.50.

The slope of the site to ensure the removal of precipitation is 0.005.

Space Planning Solution

The building in the plan has a complex shape with dimensions along the 18x45 axes, according to the planning structure - sectional, with an attic and a technical underground. The designed residential building has 9 floors. The height of the floor from the floor of the lower floor is 2.8 m. The distance from the ground level to the zero elevation of the first floor is 1.1 m. On the plan of the standard floor there are 1 three-room, 2 two-room and 1 one-room apartments. One bedroom apartment consists of kitchen, bathroom, living room and bedroom.

This building has 2 degrees of durability, 3 degrees of fire resistance. Therefore, the building belongs to the 2nd class of buildings.

In case of fire, staircases and staircases made of non-combustible material are provided, doors are opened on the escape route in the direction of exit from the building. The width of the flights of stairs is assigned taking into account the provision of evacuation - 1.2 m, between the march a gap of 100 mm is provided for passing fire hoses. The width of the sites is 1.5 m, which corresponds to the norm.

Engineering support

Water supply - domestic potable water supply, design head in the base of section unit 34, 3m (3.43 * 105Pa)

Sewerage - household in the city network; internal drain with open outlet to the pavement.

Heating - central water, single-tube system with RSG2 radiator for design temperatures minus 40.45,500 S. Coolant temperature 105 - 700 С.

Ventilation - natural exhaust from bathrooms and kitchens.

Hot water supply - from an external network with circulation in risers and highways. Design head in the base of the section unit 31.1 m. (3.11 * 105 Pa)

Power supply - category II from external mains, voltage 380/220V.

Lighting - filament lamps.

Communication devices - collective television antennas, telephone inputs.

Waste water - with a camera on the 1st floor, with replaceable containers.

Elevator - passenger lifting capacity 320 kg.

Drawings content

icon Лист2.cdw

Лист2.cdw

icon Лист2.dwg

Лист2.dwg

icon Лист1.dwg

Лист1.dwg
up Up